Visual Studio 2008: Compiler Performance

You guys asked for it and finally I have something I feel is a good software build test. Using Visual Studio 2008 I'm compiling Chromium. It's a pretty huge project that takes over forty minutes to compile from the command line on the Core i3 2100. But the results are repeatable and the compile process will stress all 12 threads at 100% for almost the entire time on a 980X so it works for me.

I don't have a full set of results here but I'm building up the database. The 2600K manages a 12% lead over the previous generation high end chips, but it can't touch the 980X. The 2500K does well but it is limited by its lack of Hyper Threading. The Phenom II X6 1100T beats it.

Visual Studio 2008: Compile Chromium

Flash Video Creation

Sorenson Squeeze Flash Video Creation

Excel Math Performance

Excel Monte Carlo Simulation

Excel Math Operations

File Compression/Decompression Performance Gaming Performance
Comments Locked

283 Comments

View All Comments

  • Rick83 - Monday, January 3, 2011 - link

    I just checked the manual to MSI's 7676 Mainboard (high-end H67) and it lists cpu core multiplier in the bios (page 3-7 of the manual, only limitation mentioned is that of CPU support), with nothing grayed out and overclockability a feature. As this is the 1.1 Version, I think someone misunderstood something....

    Unless MSI has messed up its Manual after all and just reused the P67 Manual.... Still, the focus on over-clocking would be most ridiculous.
  • Rick83 - Monday, January 3, 2011 - link

    also, there is this:http://www.eteknix.com/previews/foxconn-h67a-s-h67...

    Where the unlocked multiplier is specifically mentioned as a feature of the H67 board.
    So I think anandtech got it wrong here....
  • RagingDragon - Monday, January 3, 2011 - link

    Or perhaps CPU overclocking on H67 is not *officially* supported by Intel, but the motherboard makers are supporting it anyway?
  • IanWorthington - Monday, January 3, 2011 - link

    Seems to sum it up. If you want both you have to wait until Q2.

    <face palm>
  • 8steve8 - Monday, January 3, 2011 - link

    so if im someone who wants the best igp, but doesn't want to pay for overclockability, i still have to buy the K cpu... weird.
  • beginner99 - Monday, January 3, 2011 - link

    yep. This is IMHO extremely stupid. Wanted to build a PC for someone that mainly needs CPU power (video editing). An overclocked 2600k would be ideal with QS but either wait another 3 month or go all compromise...in that case H67 probably but still paying for K part and not being able to use it.
    Intel does know how to get the most money from you...
  • Hrel - Monday, January 3, 2011 - link

    haha, yeah that is stupid. You'd think on the CPU's you can overclock "K" they use the lower end GPU or not even use one at all. Makes for an awkward HTPC choice.
  • AkumaX - Monday, January 3, 2011 - link

    omg omg omg wat do i do w/ my i7-875k... (p.s. how is this comment spam?)
  • AssBall - Monday, January 3, 2011 - link

    Maybe because you sound like a 12 year old girl with ADHD.
  • usernamehere - Monday, January 3, 2011 - link

    I'm surprised nobody cares there's no native USB 3.0 support coming from Intel until 2012. It's obvious they are abusing their position as the number 1 chip maker, trying to push Light Peak as a replacement to USB. The truth is, Light Peak needs USB for power, it can never live without it (unless you like to carry around a bunch of AC adapters).
    Intel wants light peak to succeed so badly, they are leaving USB 3.0 (it's competitor) by the wayside. Since Intel sits on the USB board, they have a lot of pull in the industry, and as long as Intel wont support the standard, no manufacturer will ever get behind it 100%. Sounds very anti-competitive to me.
    Considering AMD is coming out with USB 3.0 support in Llano later this year, I've already decided to jump ship and boycott Intel. Not because I'm upset with their lack of support for USB 3.0, but because their anti-competitive practices are inexcusable; holding back the market and innovation so their own proprietary format can get a headstart. I'm done with Intel.

Log in

Don't have an account? Sign up now