POWER8 Servers: The Reality Check

As we've just seen, the specs of the POWER8 as announced at launch are very impressive. But what about the in the real world? The top models (10-12 at 4 GHz+, 2TB per socket) are still limited to the extremely expensive E870/E880, which typically costs around 3 times as much (or more) as a comparable Xeon E7 system. But there is light at the end of the tunnel: "PowerLinux" quad socket systems are more expensive than comparable x86 systems, but only by 10 to 30%.

The real competition for x86 must probably come from the third parties of the OpenPower Fondation. IBM sells them POWER8 chips at much more reasonable prices ($2k - $3k), so it is possible to build a reasonably priced POWER8 system. The POWER8 chips sold to third parties are somewhat "lighter" versions, but that is more an advantage than you would think. For example, by keeping the clockspeed a bit lower, the power consumption is lower (190W TDP). These chips also have only 4 (instead  of 8) memory buffer chips, which "limits" them to 1 TB of memory, but again this saves quite a bit of power, between 50W and 80W. In other words, the POWER8 chips available to third parties are much more reasonable and even more competitive than the power gobbling, ultra expensive behemoths that got all the attention at launch.  

Tyan already has an one socket server and several Taiwanese (Wistron) and Chinese vendors are developing 2 socket systems. Quad socket models are not yet on the horizon as far as we know, but is probably going to change soon.   

POWER8 vs. Xeon E5 v3: SPECing It Out

Unfortunately we did not have access to a full blown POWER8 system at this time. But as our loyal readers know, we do not limit our server testing to the x86 world (see here and here) . So until a POWER8 system arrives, we'll have to check out the available industry standard benchmarks. To that end we looked up the SPEC CPU2006 numbers for a single socket CPU. 

SPEC CPU2006 - One chip

The 12 cores inside the POWER8 - the single socket chips found in the more reasonable priced servers - perform very well. The integer performance is only a few percentages lower than the Intel chip and POWER8's floating point performance is well ahead of the Xeon.

Overall the POWER8 is quite capable of keeping up with the Xeon E5-2699v3. And don't let the "2.3 GHz" official clockspeed fool you into thinking that the Xeons are clocked unnecessarily low, either: in SPECint, the XEON is running at 2.8 GHz most of the time.

Ultimately, the POWER8 is able to offer slightly higher raw performance than the Intel CPUs, however it just won't be able to do so at the same performance/watt. Meanwhile the reasonable pricing of the POWER8 chips should result in third party servers that are strongly competitive with the Xeon on a performance-per-dollar basis. Reasonably priced, well performing dual and quad socket Linux on Power servers should be possible very soon.

The Competitor: IBM's POWER8 Benchmark Configuration
Comments Locked

146 Comments

View All Comments

  • MyNuts - Tuesday, May 12, 2015 - link

    Charles Babbage would be upset
  • quadibloc - Thursday, May 14, 2015 - link

    I'm shocked to hear that Oracle and IBM are charging more for their SPARC and PowerPC chips, respectively, than Intel is charging for comparable x86 chips - or, at least, I presume they are, if servers using those chips are more expensive. Since x86 has the enormous advantage of being able to run Microsoft Windows, the only way other ISAs can be viable is if they offer better performance or a lower price.
  • Kevin G - Thursday, May 14, 2015 - link

    Actually IBM comes in cheaper than Intel for comparable POWER8 hardware. IBM now is offering the processor to outside system builders so the actual prices are some what known. Tyan used to have the raw prices on their site but I can't find them again.

    Regardless, this article indicates that they top out at $3000 which is less than equivalent Xeon E7's.
  • kgardas - Thursday, May 21, 2015 - link

    Sure, SPARC and POWER are (was in case of POWER) more expensive, but usually hardware price is nothing in comparison with software price if you are running enterprise. Also SPARC is also Oracle preferred over POWER/Itanium by Oracle's price ratios... Anyway, POWER8 looks so powerful that it may even be cheaper software wise in comparison with SPARC, but that would need some clever Oracle DB benchmarking...
  • HighTech4US - Friday, May 15, 2015 - link

    Power 9 will be available when?
  • Phiro69 - Friday, May 15, 2015 - link

    I wanted to compare the E7's in this review to the E5's reviewed a few months back in your benchmark comparison tool, but I'm not seeing any of this data in it? Is it going to be there?

Log in

Don't have an account? Sign up now