Conclusion

First of all, Intel's benchmarks lend further support to what we already suspected: Intel's Scalable Xeon is better at serving databases for a number of reasons: better data locality (fewer NUMA nodes), better single-threaded performance, and a more "useable" cache. The claim that Intel offers much more predictable database performance seems very reasonable to us: the EPYC platform is much younger and much more complex to tune as it is a "virtual 8 socket" system.

Secondly it is true that the Intel Scalable Xeon is more versatile: the past 5 years AMD's presence in the server market was neglible, while Intel has been steadily adding virtualization features (posted interrupts), I/O features and more (TSX for example). Many of these features are now supported by the hypervisor and OSes out there.

The EPYC platform has some catching up to do. Firmware updates and other software updates were necessary to run a hypervisor, and only relatively recent versions of the Linux kernel (February 2017 w/4.10+) have support for the EPYC processor. So even if we doubt that the 8160 can really deliver 37% better performance than the AMD EPYC in the real world, there is no denying that the Intel Xeon is a "safer bet" for VMware virtualization.

Nevertheless, it is interesting to see that Intel admits that there are quite a few use cases out there where AMD has an advantage. The AMD EPYC has a performance per dollar advantage in webserving and Java servers, for example.

Otherwise, there is some merit to the claim that AVX-512 allows Intel to offer excellent HPC performance without the use of a GPU in compute intensive applications. At the same time, if you are after the best performance on these very parallel workloads, a GPU almost always offers several times higher performance. AVX-512 can also not save Intel in several bandwidth-intensive benchmarks such, as in fluid dynamics.


Intel Xeon-SP CPUs (Left: with Omni-Path)

One interesting element to the whole scenario is that at no point does Intel ever approach the performance per watt angle in these discussions. It leaves a big question unanswered from Intel - perhaps we should invoke Hanlon's Razor at this point and call it a missed opportunity, rather than suggest that Intel does not want to speak about power. Our own results showed a win for AMD's EPYC here though, when comparing two 145W Xeon 8176 parts to two 180W EPYC 7601 parts. More testing on specific workloads is needed.

In summary, Intel makes several good points, even when those points aren't always in their own favor. The company clearly has an interest in ensuring that the Xeon's performance leadership remains well-known in light of AMD's EPYC-fueled resurgence, and while there's nothing altruistic about Intel's benchmarking, they are working from a sound position. Still, in defending their position – and by extension their high margins – Intel does highlight the Xeon's biggest weakness versus the EPYC in this newly competitive market: the Skylake Xeon can offer excellent performance, but that performance comes with an equally heavy price tag.

HPC Benchmarks
Comments Locked

105 Comments

View All Comments

  • beginner99 - Tuesday, November 28, 2017 - link

    CPU price or server price are almost always irrelevant because the software running on them costs at least an order of magnitude more than the hardware itself. So you get the fastest server you need / the software profits from.
  • ddriver - Tuesday, November 28, 2017 - link

    Not necessarily, there is a lot of free and opensource software that is enterprise-capable.

    Also "the fastest server" actually sell in very small quantities. Clearly the cpu cost is not irrelevant as you claim. And clearly if it was irrelevant, intel would not even bother offering low price skus, which actually constitute the bulk of it sales, in terms of quantity as well as revenue.
  • yomamafor1 - Tuesday, November 28, 2017 - link

    128GB for 32 core is suspiciously low.... For that kind of core count, generally the server has 512GB or above.

    Also, 128GB of memory in this day and age is definitely not $1,500 tops. Maybe in early 2016, but definitely not this year, and definitely not next year.

    And from what I've seen, the two biggest cost factors in an enterprise grade server is the SSDs and memory. Generally memory accounts for 20% of the server cost, while SSD accounts for about 30%.

    CPU generally accounts for 10% of the cost. Not insignificant, but definitely not "makes up half of the machine's budget".

    AMD has a very hard battle to get back into the datacenter. Intel is already competing aggressively.
  • ddriver - Tuesday, November 28, 2017 - link

    Care to share with us your "correct ram amount per cpu core" formula? There I was, thinking that the amount of ram necessary was determined by the use case, turns out it is a product of core count.
  • bcronce - Tuesday, November 28, 2017 - link

    In general a server running VMs is memory limited well before CPU limited.
  • ddriver - Tuesday, November 28, 2017 - link

    Not necessarily. It depends on what kind of work will those VMs be doing. Visualized or bare metal, configuration details are dictated by the target use case. Sure, you can also build universal machines and cram them full of as much cores and memory they can take, but that is very cost ineffective.

    I can think of a usage scenario that will be most balanced with a quad core cpu and 1 terabyte of ram. Lots of data, close to no computation taking place, just data reads and writes. A big in-memory database server.

    I can think of a usage scenario that will be most balanced with a 32 core cpu and 64 gigabytes of ram. An average sized data set involved in heavy computation. A render farm node server.
  • ddriver - Tuesday, November 28, 2017 - link

    *virtualized not visualized LOL, did way too many visualizations back in the day, hands now type on autopilot...
  • yomamafor1 - Tuesday, November 28, 2017 - link

    It is certainly determined by the use cases, but after interacting with hundreds of companies and their respective workloads, generally higher core counts are mapped to higher memory capacity.

    Of course, there are always very few fringe use cases that focuses significantly on compute.
  • Holliday75 - Saturday, December 9, 2017 - link

    What about large players like Microsoft Azure or AWS? I have worked with both and neither uses anything close to what you guys talk about in terms of RAM or CPU. Its all about getting the most performance per watt. When you data center has its own substation your electric bill might be kinda high.
  • submux - Thursday, November 30, 2017 - link

    I will overlook the rudeness of your comment. I actively work with enterprise hardware and would probably not make comments like that and then recommend outfitting a server with 128GB of RAM. I don't think I've been near anything with as little as that in a long while. 128GB is circa 2012-2013.

    An enterprise needs 6 servers to ensure one operational node in a redundant environment. This is because in two data centers, you have 3 servers each. In case of a catastrophe, a full data center is lost and while a server is in maintenance and then finally another server fails. Therefore, you need precisely 6 servers to provide a reasonable SLA. 9 servers is technically more correct, in a proper 3 data center design.

    If you know anything about storage, you would prefer more servers as more servers provides better storage response times... unless you're using SAN which is pretty much reserved strictly to people who simply don't understand storage and are willing to forfeit price, performance, reliability, stability, etc... to avoid actually taking a computer science education.

    In enterprise IT, there are many things to consider. But for your virtualization platform, it's pretty simple. Fit as much capacity as possible in to as few U as possible while never dropping below 6 servers. Of course, I rarely work with less than 500 servers at a time, but I focus on taking messy 10,000+ server environments and shrinking them to 500 or less.

    See, each server you add adds cost to operation. This means man-hours. Storage costs. Degradation of performance in the fabrics, etc... it introduces meaningless complexity and requires IT engineers to waste more and more hours building illogical platforms more focused on technology than the business they were implemented for.

    If I approach a customer, I tend to let them know that unless they are prepared to invest at least $50,000 per server for 6 servers and $140,000 for the appropriate network, they should deploy using an IaaS solution (not cloud, never call IaaS cloud) where they can share a platform that was built to these requirements. The breaking point where IaaS is less economical than DIY is at about $500,000 with an OpEx investment of $400,000-$600,000 for power, connectivity, human resources, etc... annually and this doesn't even include having experts on the platform running on the data center itself.

    So with less than a minimum of $1 million a year investment in just providing infrastructure (VMware, Nutanix, KVM, Hyper-V), not even providing a platform to run on it, you're just pissing the wrong way in the wind tunnel and wasting obscene amounts of money for no apparent reason on dead-end projects run by people who spend money without considering the value provided.

    In addition, the people running your data center for that price are increasing in cost and their skillset is aging and decreasing in value over that time.

    I haven't even mentioned power, cooling, rack space, cabling, managed PDUs, electricians, plumbers, fire control, etc...

    Unless you're working with BIG DATA, an array of 2-4 TB drives for under $10,000 to feed even one 32-core AMD EPYC is such an insanely bad idea, it's borderline criminal stupidity. Let's not even discuss feeding pipelines of 6 32-core current generation CPUs per data center. It would be like trying to feed a blue whale with a teaspoon. In a virtualized configuration a deal EPYC server probably would need 100GB/s+ bandwidth to barely keep ahead of process starvation.

    If you have any interest at all in return on investment in enterprise IT, you really need to up your game to make it work on paper.

    Now... consider that if you're running a virtual data center... plain vanilla. Retail license cost of Windows Enterprise and VMware (vCenter, NSX, vSAN) for a dual 32-core EPYC is approximately $125,000 a server. Cutting back to dual 24-core with approximately the same performance would save about $30,000 a server in software alone.

    I suppose I can go on and on... but let's be pretty clear CajunArson made a fair comment and probably is considering the cost of 1-2TB per server of RAM. Not 128GB which is more of a graphics workstation in 2017.